Details

    • Type: Testing
    • Status: Closed
    • Priority: Minor
    • Resolution: Completed
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Asset Libraries
    • Labels:
      None
    • Sprint:
      LIMA | #12 | Jan21-Feb04, LIMA | #13 | Feb04-Feb18, LIMA | #14 | Feb18-Mar03

      Description

      Background:

      On the way towards GA1, there were several "reverts" that needed to be made because the Depot app was not ready for release (LPS-107406, LPS-107284, LPS-107121). Simply excluding the depot modules was not enough because there were several changes made in other apps that reference the depot feature which needed to be manually changed. These issues were detected late in the process because there was no test coverage for it.

      Task:

      Create a test plan and schedule that will systematically cover these (and future) integration/revert points in case we decide Depot should is not ready for release in the next GA. Make sure enough time is scheduled for this so any changes will not become release blockers.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                austin.chiang Austin Chiang
                Reporter:
                austin.chiang Austin Chiang
                Recent user:
                Rubén Heras
                Participants of an Issue:
              • Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Packages

                  Version Package