Details

    • Business Value:
      4
    • Similar Issues:
      Show 5 results 

      Description

      All events existing prior to Liferay 6.2 should be available when upgrading to 6.2 and using the new calendar portlet.

        Issue Links

          Activity

          Hide
          Sharon Choi added a comment -

          PASSED Manual Testing using the following steps:

          1. Add a few events with a tag in the old calendar portlet, on ee-6.1.20 bundle
          2. Shutdown Liferay bundle on ee-6.1.20
          3. Startup Liferay on 6.2 bundle, using the same database with the following line in the portal-ext
            passwords.encryption.algorithm.legacy=SHA
          4. Assert that the console displays calendar migration/data is moved to the new calendar successfully
          5. Assert that events from the old calendar display in the new calendar portlet
          6. Assert old calendar portlet is no longer in the portal

          Fixed on:
          Tomcat 7.0 + MySQL 5. Portal master GIT ID: b1aabfb4b67e4dc9d6347c2c2e75f84e08245fd4.
          Plugins master GIT ID: 2bfa9cbb6ad50fff4ed43a50544cf52e73ddd9e0.

          Users are now able to migrate old calendar events successfully into the new calendar portlet with no errors in the console.

          Show
          Sharon Choi added a comment - PASSED Manual Testing using the following steps: Add a few events with a tag in the old calendar portlet, on ee-6.1.20 bundle Shutdown Liferay bundle on ee-6.1.20 Startup Liferay on 6.2 bundle, using the same database with the following line in the portal-ext passwords.encryption.algorithm.legacy=SHA Assert that the console displays calendar migration/data is moved to the new calendar successfully Assert that events from the old calendar display in the new calendar portlet Assert old calendar portlet is no longer in the portal Fixed on: Tomcat 7.0 + MySQL 5. Portal master GIT ID: b1aabfb4b67e4dc9d6347c2c2e75f84e08245fd4. Plugins master GIT ID: 2bfa9cbb6ad50fff4ed43a50544cf52e73ddd9e0. Users are now able to migrate old calendar events successfully into the new calendar portlet with no errors in the console.

            People

            • Assignee:
              Sharon Choi
              Reporter:
              Michael Han
              Recent user:
              Randy Zhu
              Participants of an Issue:
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Development

                  Subcomponents

                    Structure Helper Panel