Uploaded image for project: 'PUBLIC - Liferay Documentation'
  1. PUBLIC - Liferay Documentation
  2. LRDOCS-10355

As a developer I would like to schedule a task at a precise configured datetime so that I can avoid conflicting ones

Details

    • New Article
    • Status: Ready For Documentation
    • Minor
    • Resolution: Unresolved
    • 7.4.x
    • Product Team Echo
    • None
    • User

    Description

      LRDOCS for LPS-126195.

      Draft / Information provided by the team: 

      "Changes should be added to this section of the existing documentation:

      https://learn.liferay.com/dxp/latest/en/site-building/displaying-content/using-the-asset-publisher-widget/configuring-asset-publisher-subscriptions.html

      under "Configuring the Asset Check Interval":

      The new option has been added below in bold

      Liferay Portal periodically checks for new assets and sends emails to subscribed users informing them about the new assets. By default, assets are checked every twenty-four hours. You can change the check interval through System Settings. Follow these steps:

      Open the Product Menu and go to Control Panel → Configuration → System Settings.

      Select Assets under the Content and Data heading.

      Go to System Scope → Asset Publisher.

      Change the Check Cron Expression or Check Interval setting to the interval (in hours) that you want to check for new assets and notify subscribed users, and click Save to apply the changes." By ruben.pulido

      Attachments

        Issue Links

          Activity

            People

              km.material KM Material
              andrew.wilkinson Andrew Wilkinson (Inactive)
              Ruben Pulido Ruben Pulido
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Dates

                Created:
                Updated:

                Packages

                  Version Package
                  7.4.x